Project M.O.S.E.S.: Difference between revisions

From Elgeis Minecraft Server Wiki
Jump to navigation Jump to search
Content added Content deleted
(added infobox)
mNo edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Infobox_location|title = Projest M.O.S.E.S.|image = MOSES and Properpolis.png|imagecaption = The opening stretch of M.O.S.E.S., featuring the endemic spruce trees, with Properpolis peeking over the horizon.|type = Oceanic Megastructure|location = High Upon the Mountain Federated Merchant Republic|construction began = 11/10/2021|construction completed = 2/14/2023}}
{{Infobox_location|title = Project M.O.S.E.S.|image = MOSES and Properpolis.png|imagecaption = The opening stretch of M.O.S.E.S., featuring the endemic spruce trees, with Properpolis peeking over the horizon.|type = Oceanic Megastructure|location = High Upon the Mountain Federated Merchant Republic|construction began = 11/10/2021|construction completed = 2/14/2023}}


'''Project M.O.S.E.S.''', often abbreviated as MOSES, is a megastructure constructed by [[HUM]] to provide a land bridge between their territorial holdings in [[Properpolis]] and [[Etel Metsia]]. The build consists of glass walls spanning the height from the seafloor to the ocean, forty blocks apart, with the area between being drained of ocean water and "terraformed" via covering the gravel seafloor with dirt, grass, trees, and other flora. The acronym in the name stands for '''M'''ove '''O'''cean '''S'''o '''E'''tel-metsia is '''S'''ecure.
'''Project M.O.S.E.S.''', often abbreviated as MOSES or The Project, is a megastructure constructed by [[HUM]] to provide a land bridge between their territorial holdings in [[Properpolis]] and [[Etel Metsia]]. The build consists of glass walls spanning the height from the seafloor to the ocean, forty blocks apart, with the area between being drained of ocean water and "terraformed" via covering the gravel seafloor with dirt, grass, trees, and other flora.


The acronym in the name stands for '''M'''ove '''O'''cean '''S'''o '''E'''tel-metsia is '''S'''ecure.
== Background ==


Notable features of M.O.S.E.S. include two shipwrecks (one of which is fully preserved and another which the glass wall cuts in half), an ocean ravine which has been turned into a river, and a restored island which previously had been devastated due to sand mining.
[[File:Project MOSES Landscape.png|none|thumb|470x470px|An image of the vegetation of MOSES taken by doctorspaghetti.]]

== Background ==
[[File:Vailan Lake MOSES.png|thumb|The Vailic lake construction served as inspiration for the construction that would eventually be known as Project MOSES.]]
=== Land Woes ===
=== Land Woes ===
Upon the merger between HUM and Etel Metsia, the Hummite government sought to connect their capital city to the sizeable lands acquired in Etel Metsia to the southwest in order to aid in transportation of resources and infrastructural development, as well as encourage settlement in the area. However, the lands to the west that would connect the two are claimed by Montrose, and concern similar lands to those that negotiations had already fallen through regarding attempts to de-enclave the Hummite settlement of [[Iris]]. As a last resort, proposals were made to exchange culturally significant lands like the ruins of the [[Icedale Guild]] for a contiguous corridor. These were roundly rejected by Montrose, so the dream for over-land local development beyond the limits of the capital city seemed to be in grim condition.
Upon the merger between HUM and Etel Metsia, the Hummite government sought to connect their capital city to the sizeable lands acquired in Etel Metsia to the southwest in order to aid in transportation of resources and infrastructural development, as well as encourage settlement in the area. However, the lands to the west that would connect the two are claimed by Montrose, and concern similar lands to those that negotiations had already fallen through regarding attempts to de-enclave the Hummite settlement of [[Iris]]. As a last resort, proposals were made to exchange culturally significant lands like the ruins of the [[Icedale Guild]] for a contiguous corridor. These were roundly rejected by Montrose, so the dream for over-land local development beyond the limits of the capital city seemed to be in grim condition.


=== Northern Inspiration ===
=== Northern Inspiration ===
[[File:MOSES Concept Art.png|thumb|Conceptualization of Project MOSES by GoatWhisperer as the idea was proposed on 10/05/2021]]
[[File:Vailan Lake MOSES.png|thumb|The Vailic lake construction served as inspiration for the construction that would eventually be known as Project MOSES.]]
Around this time, [[Flashy10]] of [[Kingdom of Vailan]] had completed a massive project to create a lake out of a mountainous valley to the north of [[Fjall]], their capital city. Appreciating this instance of Vailan's "Think and Do" mentality and the "big lake energy" such a construction emanated, Hummite [[GoatWhisperer]] began to devise a strategy to accomplish the inverse to connect HUM's disparate land holdings. He noted that, while they were disallowed from expanding their territorial holdings, the state owned a large swathe of oceanic territory that was situated between the landmasses. While a much easier project to accomplish would be to simply build out dirt islands over the ocean to form land, GoatWhisperer felt that the "bending of nature to our will" would exemplify the strength of HUM and be a more remarkable feat, creating a world wonder that would help grow HUM's reputation for accomplishing the unthinkable.
Around this time, [[Flashy10]] of [[Kingdom of Vailan]] had completed a massive project to create a lake out of a mountainous valley to the north of [[Fjall]], their capital city. Appreciating this instance of Vailan's "Think and Do" mentality and the "big lake energy" such a construction emanated, Hummite [[GoatWhisperer]] began to devise a strategy to accomplish the inverse to connect HUM's disparate land holdings. He noted that, while they were disallowed from expanding their territorial holdings, the state owned a large swathe of oceanic territory that was situated between the landmasses. While a much easier project to accomplish would be to simply build out dirt islands over the ocean to form land, GoatWhisperer felt that the "bending of nature to our will" would exemplify the strength of HUM and be a more remarkable feat, creating a world wonder that would help grow HUM's reputation for accomplishing the unthinkable.


=== Proposal ===
=== Proposal ===
On 10/05/2021, GoatWhisperer announced he had a "harebrained scheme" for the Hummite population's consideration. He pitched it thus:
On 10/05/2021, GoatWhisperer announced he had a "harebrained scheme" for the Hummite population's consideration. He pitched it thus:
<blockquote>"This is a rough, rough approximation... but the core of the idea is to wall off and drain a portion of ocean. We could even cover the land in grass, trees, wildlife to make it appear natural. With a pinch of terraforming, this would create a bridge of usable land running from Proper to Etel Metsia, allowing roads and other over-land development to be built between them. We could also expand the corridor in the future should we desire. While this would be quite the project, my thought to make it doable would be to split the corridor into smaller portions and filling these sections with wooden planks. Wouldn't require much skill. Once the water is displaced it's a simple matter of burning the wood out. This would probably be cheaper and easier than attempting to do it with sponges or something, though that's also an option.</blockquote>The proposal was met with significant praise. Then-Chancellor [[ClapYoThighs]] deemed it a "HUM Level Project" and suggested HUM "make some fancy ass glass walls that hold it all in. Gonna be like [[Rapture]] on Crack." Hummites [[DoctorSpaghetti|doctorspaghetti]], [[argetlam04]], and [[coolnut10]] also spoke in favor. As such, it was adopted as a national project.
[[File:MOSES Concept Art.png|thumb|Conceptualization of Project MOSES by GoatWhisperer as the idea was proposed on 10/05/2021]]
<blockquote>"This is a rough, rough approximation... but the core of the idea is to wall off and drain a portion of ocean. We could even cover the land in grass, trees, wildlife to make it appear natural. With a pinch of terraforming, this would create a bridge of usable land running from Proper to Etel Metsia, allowing roads and other over-land development to be built between them. We could also expand the corridor in the future should we desire. While this would be quite the project, my thought to make it doable would be to split the corridor into smaller portions and filling these sections with wooden planks. Wouldn't require much skill. Once the water is displaced it's a simple matter of burning the wood out. This would probably be cheaper and easier than attempting to do it with sponges or something, though that's also an option.</blockquote>The proposal was met with significant praise. Then-Chancellor [[ClapYoThighs]] deemed it a "HUM Level Project" and suggested HUM "make some fancy ass glass walls that hold it all in. Gonna be like [[Rapture]] on Crack". Hummites [[DoctorSpaghetti|doctorspaghetti]], [[argetlam04]], and [[coolnut10]] also spoke in favor. As such, it was adopted as a national project.


== Construction ==
== Construction ==
[[File:MOSES spaghettiplan.png|thumb|The blueprints doctorspaghetti used to form the first guidelines of MOSES.]]
[[File:MOSES spaghettiplan.png|thumb|The blueprints doctorspaghetti used to form the first guidelines of MOSES.[[File:Doctorspaghetti's tree efforts in MOSES.png|thumb|The first terraforming efforts in MOSES by doctorspaghetti on 3/09/2022.|left]]|left]]
[[File:Arget moses machines.png|thumb|Argetlam04's MOSES machines at work early in the Project, 12/29/2021[[File:Spaghetti Island.png|thumb|An island was reconstructed by doctorspaghetti as part of the construction of Project MOSES on 3/13/2022.|297x297px]]]]
The complete construction of the Project, from the first laying of outlines to the last portions of water being removed, took a year and three months. The Project was very labor intensive, with the majority of water requiring hand-placed wooden planks to be removed before the sections would be set alight to remove the wood. This process was made easier when argetlam04 created floating piston machines which could drain water as they moved along, however these machines only worked in straight paths with significant depth, and stopped when the highest level of seafloor was reached. Outside of these geometrically simple portions, the water in MOSES was drained by hand.
The construction of the Project, from the first laying of outlines to the last portions of water being removed, took a year and three months. Terraforming efforts are ongoing. Constructing the Project was very labor intensive, with the majority of water requiring hand-placed wooden planks to be removed before the sections would be set alight to remove the wood. Sponges could not be used, as the limited quantity available and time required to dry them out when the would make them ineffective at the scale MOSES required.

This process was made easier when argetlam04 created floating piston machines (called MOSES machines) which could drain water as they moved along, however these machines only worked in straight paths with significant depth, and stopped when the highest level of seafloor was reached. There was some controversy over the legality of these machines due to the "no floating structures" rule that was in place at this time, but this was a misunderstanding - piston machines themselves were fine, and structures suspended in water were fine (see the numerous boats built around the world), only structures floating in the air without supports were a problem whether piston machines or not. Since these machines remained "supported" by the water underneath them as they worked, they were completely legal within the rules of the server.

Outside of the geometrically simple portions the MOSES machines could handle, the water in MOSES was drained by hand, block by block.


* On 11/10/2021, doctorspaghetti drew up plans for the bounds of the structure and laid down the first bone blocks to demonstrate the path, beginning the construction phase.
* On 11/24/2021, [[Coblue]] volunteered to use his experience building circles to revise the curve.
* [[File:Spaghetti Island.png|thumb|An island was reconstructed by doctorspaghetti as part of the construction of Project MOSES on 3/13/2022.]]On 3/13/2022, doctorspaghetti reconstructed the island in the middle of the Project which had originally been flattened by the prolific sand-mining company [[Dinoking93 Excavation Incorporated]] in 2018, adding sand, grass, and a singular tree.


* On 3/31/2022, [[AbstractEgg]] drained the majority of the curve portion of the Project.


[[File:AbstractEgg Curve Drain.png|thumb|A picture taken by AbstractEgg of the curve of MOSES immediately post-drainage on 3/31/2022.]]
[[File:AbstractEgg Curve Drain.png|thumb|A picture taken by AbstractEgg of the curve of MOSES immediately post-drainage on 3/31/2022.]]
[[File:Coolnut wood.png|thumb|Significant progress made on the "last leg" by coolnut10 on 1/15/2023.]]
[[File:Halfway there.png|thumb|GoatWhisperer filled in more wood and burned out all wood that had been placed so far by coolnut10, getting the last leg of MOSES slightly beyond halfway done.]]
[[File:MOSES Dry as a bone.png|thumb|Project MOSES immediately after the last blocks of water were drained.]]

=== Timeline ===
The following timeline is not exhaustive, but attempts to list the major contributions to the Project and dates they occurred.
* On '''11/10/2021''', doctorspaghetti drew up plans for the bounds of the structure and laid down the first bone blocks to demonstrate the path, beginning the construction phase. On this date, argetlam04 also built the first MOSES machine prototypes.
* On '''11/24/2021''', [[Coblue]] volunteered to use his experience building circles to revise the curve.
* On '''12/28/2021''', the entirety of the bone blocks placed down in order to guide the construction of the walls were discovered to be torn down and stolen, setting back construction significantly. In addition, all the bone blocks from the chests at the worksite were stolen, hampering the ability of Hummites to rebuild it. Interestingly, the glass walls that had been placed were not damaged. Due to a window of at least ~three days and at most ten days in which the crime could have taken place, investigations were not pursued heavily and the perpetrator of this act has still not been identified.
* On '''12/29/2021''', argetlam04 began utilizing a fleet of MOSES machines to drain water in full force for the first time.
*On '''3/09/2022''', doctorspaghetti laid down a layer of dirt, grew grass, and planted trees in the first section of the Project which had been drained.
*On '''3/10/2022''', Coblue once again used his expertise to reconstruct the curve. Hummites worked to rebuild the remainder of the guidelines where the glass walls still needed to be built.
* On '''3/13/2022''', doctorspaghetti reconstructed the island in the middle of the Project which had originally been flattened by the prolific sand-mining company [[Dinoking93 Excavation Incorporated]] in 2018, adding sand, grass, and a singular tree.

* On '''3/31/2022''', [[AbstractEgg]] drained the majority of the curve portion of the Project.


* On 7/11/2022, GoatWhisperer completed the placement of glass walls along the bone blocks from the curve to Etel Metsia.
* On '''7/11/2022''', GoatWhisperer completed the placement of glass walls along the bone blocks from the curve to Etel Metsia.
* On 7/15/2022, [[catpaco]] assisted GoatWhisperer in completing drainage of the curve and sections immediately post-curve, which were some of the deepest areas in the entire project.
* On '''7/15/2022''', [[catpaco]] assisted GoatWhisperer in completing drainage of sections immediately pre-curve, which were some of the deepest areas in the project. This resulted in water being completely cleared from the Properpolis entrance of the Project to the island in the middle of the Project.
* On '''1/04/2023''', argetlam04 removed "a TON of water, like literally all that I can with machines from the first segment" of the last third of the Project.
* On '''1/15/2023''', coolnut10 made significant progress on laying wood in the remaining water immediately after the curve island.
* On '''2/12/2023''', GoatWhisperer filled in wood just over the halfway point of the "last leg" and burned out all wood currently placed.
* On '''2/12/2023''', argetlam04 completed the draining of all water available to be drained via MOSES machines, stating "machines are no longer useful for Moses. Any and all water you see should be filled."
* On '''2/13/2023''', GoatWhisperer completed draining of the rest of the water on the Etel Metsian side, completing the water draining of the Project, declaring "Project MOSES is now dry as a bone."

Latest revision as of 17:33, 24 February 2023

Project M.O.S.E.S., often abbreviated as MOSES or The Project, is a megastructure constructed by HUM to provide a land bridge between their territorial holdings in Properpolis and Etel Metsia. The build consists of glass walls spanning the height from the seafloor to the ocean, forty blocks apart, with the area between being drained of ocean water and "terraformed" via covering the gravel seafloor with dirt, grass, trees, and other flora.

The acronym in the name stands for Move Ocean So Etel-metsia is Secure.

Notable features of M.O.S.E.S. include two shipwrecks (one of which is fully preserved and another which the glass wall cuts in half), an ocean ravine which has been turned into a river, and a restored island which previously had been devastated due to sand mining.

An image of the vegetation of MOSES taken by doctorspaghetti.

Background

The Vailic lake construction served as inspiration for the construction that would eventually be known as Project MOSES.

Land Woes

Upon the merger between HUM and Etel Metsia, the Hummite government sought to connect their capital city to the sizeable lands acquired in Etel Metsia to the southwest in order to aid in transportation of resources and infrastructural development, as well as encourage settlement in the area. However, the lands to the west that would connect the two are claimed by Montrose, and concern similar lands to those that negotiations had already fallen through regarding attempts to de-enclave the Hummite settlement of Iris. As a last resort, proposals were made to exchange culturally significant lands like the ruins of the Icedale Guild for a contiguous corridor. These were roundly rejected by Montrose, so the dream for over-land local development beyond the limits of the capital city seemed to be in grim condition.

Northern Inspiration

Conceptualization of Project MOSES by GoatWhisperer as the idea was proposed on 10/05/2021

Around this time, Flashy10 of Kingdom of Vailan had completed a massive project to create a lake out of a mountainous valley to the north of Fjall, their capital city. Appreciating this instance of Vailan's "Think and Do" mentality and the "big lake energy" such a construction emanated, Hummite GoatWhisperer began to devise a strategy to accomplish the inverse to connect HUM's disparate land holdings. He noted that, while they were disallowed from expanding their territorial holdings, the state owned a large swathe of oceanic territory that was situated between the landmasses. While a much easier project to accomplish would be to simply build out dirt islands over the ocean to form land, GoatWhisperer felt that the "bending of nature to our will" would exemplify the strength of HUM and be a more remarkable feat, creating a world wonder that would help grow HUM's reputation for accomplishing the unthinkable.

Proposal

On 10/05/2021, GoatWhisperer announced he had a "harebrained scheme" for the Hummite population's consideration. He pitched it thus:

"This is a rough, rough approximation... but the core of the idea is to wall off and drain a portion of ocean. We could even cover the land in grass, trees, wildlife to make it appear natural. With a pinch of terraforming, this would create a bridge of usable land running from Proper to Etel Metsia, allowing roads and other over-land development to be built between them. We could also expand the corridor in the future should we desire. While this would be quite the project, my thought to make it doable would be to split the corridor into smaller portions and filling these sections with wooden planks. Wouldn't require much skill. Once the water is displaced it's a simple matter of burning the wood out. This would probably be cheaper and easier than attempting to do it with sponges or something, though that's also an option.

The proposal was met with significant praise. Then-Chancellor ClapYoThighs deemed it a "HUM Level Project" and suggested HUM "make some fancy ass glass walls that hold it all in. Gonna be like Rapture on Crack." Hummites doctorspaghetti, argetlam04, and coolnut10 also spoke in favor. As such, it was adopted as a national project.

Construction

The blueprints doctorspaghetti used to form the first guidelines of MOSES.
The first terraforming efforts in MOSES by doctorspaghetti on 3/09/2022.
Argetlam04's MOSES machines at work early in the Project, 12/29/2021
An island was reconstructed by doctorspaghetti as part of the construction of Project MOSES on 3/13/2022.

The construction of the Project, from the first laying of outlines to the last portions of water being removed, took a year and three months. Terraforming efforts are ongoing. Constructing the Project was very labor intensive, with the majority of water requiring hand-placed wooden planks to be removed before the sections would be set alight to remove the wood. Sponges could not be used, as the limited quantity available and time required to dry them out when the would make them ineffective at the scale MOSES required.

This process was made easier when argetlam04 created floating piston machines (called MOSES machines) which could drain water as they moved along, however these machines only worked in straight paths with significant depth, and stopped when the highest level of seafloor was reached. There was some controversy over the legality of these machines due to the "no floating structures" rule that was in place at this time, but this was a misunderstanding - piston machines themselves were fine, and structures suspended in water were fine (see the numerous boats built around the world), only structures floating in the air without supports were a problem whether piston machines or not. Since these machines remained "supported" by the water underneath them as they worked, they were completely legal within the rules of the server.

Outside of the geometrically simple portions the MOSES machines could handle, the water in MOSES was drained by hand, block by block.


A picture taken by AbstractEgg of the curve of MOSES immediately post-drainage on 3/31/2022.
Significant progress made on the "last leg" by coolnut10 on 1/15/2023.
GoatWhisperer filled in more wood and burned out all wood that had been placed so far by coolnut10, getting the last leg of MOSES slightly beyond halfway done.
Project MOSES immediately after the last blocks of water were drained.

Timeline

The following timeline is not exhaustive, but attempts to list the major contributions to the Project and dates they occurred.

  • On 11/10/2021, doctorspaghetti drew up plans for the bounds of the structure and laid down the first bone blocks to demonstrate the path, beginning the construction phase. On this date, argetlam04 also built the first MOSES machine prototypes.
  • On 11/24/2021, Coblue volunteered to use his experience building circles to revise the curve.
  • On 12/28/2021, the entirety of the bone blocks placed down in order to guide the construction of the walls were discovered to be torn down and stolen, setting back construction significantly. In addition, all the bone blocks from the chests at the worksite were stolen, hampering the ability of Hummites to rebuild it. Interestingly, the glass walls that had been placed were not damaged. Due to a window of at least ~three days and at most ten days in which the crime could have taken place, investigations were not pursued heavily and the perpetrator of this act has still not been identified.
  • On 12/29/2021, argetlam04 began utilizing a fleet of MOSES machines to drain water in full force for the first time.
  • On 3/09/2022, doctorspaghetti laid down a layer of dirt, grew grass, and planted trees in the first section of the Project which had been drained.
  • On 3/10/2022, Coblue once again used his expertise to reconstruct the curve. Hummites worked to rebuild the remainder of the guidelines where the glass walls still needed to be built.
  • On 3/13/2022, doctorspaghetti reconstructed the island in the middle of the Project which had originally been flattened by the prolific sand-mining company Dinoking93 Excavation Incorporated in 2018, adding sand, grass, and a singular tree.
  • On 3/31/2022, AbstractEgg drained the majority of the curve portion of the Project.
  • On 7/11/2022, GoatWhisperer completed the placement of glass walls along the bone blocks from the curve to Etel Metsia.
  • On 7/15/2022, catpaco assisted GoatWhisperer in completing drainage of sections immediately pre-curve, which were some of the deepest areas in the project. This resulted in water being completely cleared from the Properpolis entrance of the Project to the island in the middle of the Project.
  • On 1/04/2023, argetlam04 removed "a TON of water, like literally all that I can with machines from the first segment" of the last third of the Project.
  • On 1/15/2023, coolnut10 made significant progress on laying wood in the remaining water immediately after the curve island.
  • On 2/12/2023, GoatWhisperer filled in wood just over the halfway point of the "last leg" and burned out all wood currently placed.
  • On 2/12/2023, argetlam04 completed the draining of all water available to be drained via MOSES machines, stating "machines are no longer useful for Moses. Any and all water you see should be filled."
  • On 2/13/2023, GoatWhisperer completed draining of the rest of the water on the Etel Metsian side, completing the water draining of the Project, declaring "Project MOSES is now dry as a bone."